Basic introduction of steelplate coating line 1.1 CJMST1300/1600 3 coating 2 baking production line a) Type: Contious chemical pretreatment puls 3 coating 2 baking system equipments. b) Precise of coated film: thickness of dry film as below: ≤±0.002MM c) Line speed: Maximum speed of designed: 80 m/min Maximum speed of production: 60 m/min d) major raw materials: MaterialSteel coilThickness0.25-1.2 MMWidth of coil800-1250 MMWeight of Uncoiled steel coilMax 10 tonWeight of Recoiled steel coilMax 5 tonDiameter of inner of uncoilerφ508 MMDiameter of inner of recoilerφ508 MM Accessory material 1): Name of chemicalAlkalesence degreaserChromateConsistence of liquidProvided by supplierSupported by supplierConsumption kg/m2Provided by supplierSupported by supplier Accessory material 2): Comodity of paint Polyester resin Acrylic resin Viscosity (FUT 4 #) 60 110 s55 110 sThickness of dry film (um) 15 2515 20temperature(base sheet) °C 210 224193 210e) weight of dry film of coated coil: mg/m2 (Provided by supplier) f) heat method of degreasing tank: Required temperature of liquidMax 60 ºCType of heatingElectric heaterg) Base of establishments 1) Resource of electrically a. Major resource of electrically: AC 380V × 3 PHASE × 50 Hz b. Operating resource of electrically: AC 200V × 1 PHASE × 50 Hz c. Errors of valtage: ±10% e. Electric power: 300 KW 2). Air compressure: 4 6kg/cm2 3). Pressure of pure water:2-3kg/cm2 Total water quantity: 3ton/h 4) Liquefied gas(or natural gas) pressure Total gas usage: about 100kg/h h) Dimension:Length×width×height=114000×7500×9000 i) Total weight: about 300 tons